Ultra Dairy Substation Industrial

Ultra Dairy Substation

Client Byrne Dairy/Ultra Dairy
Completion Date 2017
Location East Syracuse, New York

Huen Electric crews constructed a new 115,000-square-foot, 13,200-volt substation for the Byrne Dairy, “Ultra Dairy,” facility in East Syracuse, New York. This new substation can provide up to 18 megawatts of power to the facility. Byrne Dairy needed three times the volt distribution that the previous system couldn’t provide, along with the reliability of transmission line power. Byrne Dairy turned to Huen to design and build a new high-voltage substation.

As the lead contractor, we were responsible for all aspects of the substation construction, from engineering, utility coordination, civil site work, concrete foundations, and steel infrastructure, to all associated equipment, testing, and commissioning. We accomplished this by teaming up with highly skilled sub-contractors.